The 2024 opening round for the subsidy Stimulation of Sustainable Energy Production and Climate Transition (SDE++) runs from September 10, 2024 to October 10, 2024. The budget for 2024 is € 11.5 billion. If the full budget is requested and deployed, this is expected to result in a CO2 saving of 4.7 megatons in 2030.
SDE++ 2024: Subsidie voor hernieuwbare energieproductie en CO2-reductie
The 2024 opening round for the subsidy Stimulation of Sustainable Energy Production and Climate Transition (SDE++) runs from September 10, 2024 to October 10, 2024. The budget for 2024 is € 11.5 billion.
- https://www.subvention.nl
- STAND: 6E14
Share:
Facebook
Twitter
LinkedIn
WhatsApp
Contactinformatie
Stuur ons een bericht
- 8025 AV,
- ZWOLLE,
- Netherlands